Maintain uniform clearance or gaps between wall and door frame to receive the wall finishes as per approved shop drawing. Required samples of solid surfacing should be submitted for review and Engineers approval before proceeding with the work. Drill Machine (110 volts or 220 volts as per site The Site Engineer/Supervisor and/or foremen are solely responsible in the procedure assuring all materials installed permanently and works being implemented are in conformance with specifications and manufactures recommendation. in the order of top and bottom together and then the center one. Insert plastic plugs in order to conceal screw heads. In 2016, he established his own company in Egypt Planning Engineer Est. Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. covered properly. required. Components shall be staggered or separated with spacers as necessary to prevent damage by and to projecting ironmongery, beads, etc. All joinery shall be kept covered during transit and kept clear of the ground at the Site. are fabricated and Factory, Powder Coated to the main contractor Approved Color and does requirements, and equipment intended to be used in performing the works size and weight of the door following steps are explained with regards to same Hence, utmost care is to be taken in shall be provided to avoid damages. Mixing & placing of grout shall be done as per grout manufactures instruction. The scope of work described in this method statement is Remove any scratches or stains after installation. Pallet and Door Frames are wrapped, with above, the following cares are to betaken while storing the materials on the Construction Site. The door leaves to hang on the respective frames with proposed number of materials to the site through earmarked pedestrian access/egress. Safe manual lifting procedure shall be used for erection of hollow metal door. Documentation of all inspection and tests made shall also be his responsibility. as per design and weight of the door. expansion type anchor bolt. Door height more than 2.2m, 4 number of hinges will be Following tools shall be arranged before starting the work onsite. We will display articles explaining all the elements of civil engineering from design, testing, and a special part for the project management and quality control department. Prior to commence with door & frames installation ensure concrete work, masonry work (i.e. Ensure the sliding folding door with the door schedule and door types elevations for size, ironmongery, acoustic, and fire rating requirements before commence the works. Fix the archwirave on wall to the frame by adhesive (approved material) and steel clamp. Lifting of blast door will be done by crane and as per Aramco lifting procedure. Storage facilitieswill be provided. their respective manufacturers instructions, SDI standards & as per It is the Policy of "Company Name" to provide a safe and healthy place of employment. immediately removed after tooling and finishing. Hence, utmost care is to be taken in All three sides door frames are fitted with a travel spacer bar at the base. No other materials to be place on top of stacked doors. The capacity / size of the above tools and equipment shall be judged in accordance with site conditions, requirements, and availability at the time of execution. Applying several very light It will include Product location, Size and Project Name. are fabricated and FactoryPowder Coated to the main contractor Approved Color and does All surrounding gaps will be filled with silicone. Prior fixing the male and female part, glazing tape to be Door Leaves are to be prevented fromgetting direct deposit of dusts and sand, to avoid the Vehicle should travel in designated access area after Adjust the position of the wedges in order to obtain the required vertical and horizontal alignment. After installation, Installation Team will check the proper We need your help to maintenance this website. Civil Engineering Blog. not require any further coating/touch-upsat the site, unless being damaged at/after the receipt of were completed and dry. color and the evenness of coating, at all the stages Frame and door leaf shifting can be done by two (2) Before start of the sliding doors installation work, make sure the approval of material submittal and subcontractor / supplier. a) Operate latches and door panel to check for misalignment and binding. Each slot shall be covered with steel putty, during final door coating. It should not exceed 3 mm along the two long edges and along the top of the of the door leaf (tolerance of +-1 mm). a) Check to make sure that the frame is properly located on the hinged side of the concrete wall, once the door & frame are plumbed. Tag:method of statement, method of statement for wood door installation, method statement, solid hardwood, wood door installation, Wood veneer. hinges (preferably 5 to 6 hinges). (vision lite frame). Approved hardware set will be installed in accordance with the approved manufacturers manual and instructions for each set of ironmongery. Replace doors that do not swing or operate freely. MIR to be raised immediately after material delivery and as per SDI standard. They will then complete a site walk to ensure and verify that all the controls are in place. To keep our site running, we need your help to cover our server cost (about $400/m), a small donation will help us a lot. Install and hang the door leaf using approved number of hinges as per approved shop drawing and approved materials. Install the frame into the structural opening. make sure to avoid any damage. As per the opening number, installer team will segregate the Doors shall be anchored to the wall by means of vendor provided anchor bolts. Filling surfaces defects using Natural Putty Filler. The door leaves to hang on the respective frames with proposed number of the floor by connecting the corner clip. completion if the leaf is not yet installed at the same time. e) Correct as needed. He shall coordinate with Contractors Representative regarding inspection and testing activities. All materials to be delivered and be made available on site by the responsible contractor prior to technicians commencing the aluminium doors installation work. Ensure that sliding folding door set as per approved door schedule, detail elevations, and details. Proper PPE will be Door Leaves are to be prevented from. A. MethodstatementHQ Serving the Construction Industry Since 11 Years. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. Two technician is sufficient to carry the weight (50 kg) of Grouting inside the All employees shall attend Safety Induction and training Course to identify all Hazards associated with this work. Sliding doors installation should be done as per the manufacturer recommendations. He is responsible to ensure the full implementation of the required minimum quality requirements, Procedures and maintain the required documentation as per applicable company inspection and test Plan for the final acceptance and handover of documents. The list of finishing hardware for each door shall be given in construction drawings. Finishing works of doors shall be done as per the finishing schedule given in construction drawings. Keeping the frame in D. Install, align and fit the doors in frames with uniform clearance and bevel to provide 3mm at heads, jambs and between pairs of doors, bottom of door to top of decorative floor finish or covering as per approved shop drawings. Door height more than 2.2m, 4 or more number of hinges must Polythene as a base and corrugated carton may used as a top packing. applicable for installation of Metal Door and Inspection requestto be submitted after completion of works for the necessary approvals. covered properly. Secure the frame temporarily using timber wedges. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof. All doors will be packed with plastic, cardboard protection to edges. before starting the installation. Take necessary action ASAP with help of experts. All frames that fix above the floor finishing level up to 2.2m PURPOSE 2. JOB SAFETY ANALYSIS. Humidity on site should be within the range during storage and installation on site. Additionally, in-case the materials are to be wiped, the Method Statement Template for Installation Metal / Steel Door. Ensure industry tolerances between the frame and the door Installation of frames to be carried out strictly adhering hinge. The Materials are arranged in a Container/Truck in such a The gap between the door and frame must be suitable for the intumescent seal. Serving Construction Projects Since 2015. Ensure that shop drawings is complete and method of aluminium door fixation, details of aluminium units is approved by the consultant/client. The samples shall show color, finish and details of edging, forming etc. Fire Rated Sticker will be fix on Door Shutter Between the Hinges with Screw. obtaining necessary permission from thesecurity and it should be fixed with evolving flashlight on materials (Repair works procedure). throughout the lifecycle of the materials. He is responsible for monitoring the work area for any unsafe conditions and make corrective actions where necessary. ladder is not required, but if the more than 2.2m mobile tower/scaffold is formation of scratches on the topcoat. The work shall be executed in accordance with the approved safety plan. standard steel doors owing to its design, space, and weight. All Right Reserved. Protect door as recommended by manufacturer to ensure that wood doors are without damage or deterioration at the time of Substantial Completion. to be followed: Sand the damaged area: Use sandpaper to remove any existing The Site Manager ensures that the Site QC Section are provided with the necessary facilities and cooperation from all Supervisor, Foreman and Labor to enable satisfactory inspection and verification of activities performed by the site civil section. Both the RAMS and Pre-works briefing will be located on site with the Works Supervisor for reference and review. not require any further coating/touch-ups, at the site, unless being damaged at/after the receipt of Approximately 10mm clear shall be provided all around the door frame. also gives a smooth and professional finish. dirt deposited on it time to time]followed by extensive exposure to dust-free and more may cause serious damage tothe bottom most frame. The spur should be provided to the left or right side at operator height. Sealant shall be applied around the door frame at the final wall finishing surface, as shown in construction drawings. This method statement describes the activities and process of Sliding Folding Doors installation works for School Project works include preparation, installation and protection as per the project requirement. WIR should be submitted to the CONSULTANT for the inspection. The contents of this method statement shall be explained and demonstrated to all involved personnel based on specific task allocation. 3.1.1 NFPA 80: Standard for fire doors and other opening protective -National Fire Protection Association, 3.2.1 SAES-M-100: Saudi Aramco Building Code 3.2.2 SATIP-M-100-07 Doors & Windows Typical Inspection Plan 3.2.3 SAIC-M-1046 Doors Receiving Inspection 3.2.4 SAIC-M-1047 Doors Pre installation Inspection 3.2.5 SAIC-M-1049 Door Installation Inspection. All tape and factory-applied shipping materials must be removed from the operating mechanism. Enter your email address to subscribe and receive notifications when new documents are released. The door is a finished product so the operator and technician should Gasket shall be installed before the completion. regulation and safety plan. kg) with help of the lifting equipment Temporary supports shall be provided to hold the doors to restrict movement, during handling and grouting works. Smoothing and preparing surfaces for Painting. by beam panel saw to ensure the size. Timber bracing may be used to support and maintain the alignment of the door frame. approved mockup). 6.1.1 Begin the installation by SELECTING THE DOOR ASSEMBLY and matching the opening as per the schedule. March 18, 2019 | Author: black_32899650 | Category: Method Statement for Salambigar Industrial Park Threading Shop & SMC LBD Project, Report "17. Masking tapes should be ACOUSTIC PANELS,CLADDING,WOODEN DECKING PLATFORM/STAGE. doors and frame to the designated location. Sliding folder door frame shall be seals to meet performance requirements in line with manufacturer's standards as per approved detail elevations, and details. required. the door during installation. Aluminium sliding doors to be set up according to their operating specification. This procedure includes installation of blast door on embedded sub frame & hollow metal doors on wall panels for buildings. Ensure that doors location & verify the dimension of opening as indicated in the approved shop drawing & schedule. Apply all 8 screws and tighten them until flush with the Site Engineer / Supervisor, subcontractors signatures shall be taken on the approved method statement as a matter of record. Please Do Not Enter any Spam Link in the Comment Box. getting direct deposit of dusts and sand, to avoid the Ensure that the materials are per approved material submittals, clean and free from damage, suitable for installation. To see this page as it is meant to appear, please enable your Javascript! Unloading of material delivery at site with the delivery note. frames are not required. Clean all joints thoroughly to ensure that adhesion of the silicone to Below is the procedure for performing the sliding door/ aluminum door installation for any kind of building project. duty forklifts shall be employed for installation. When grouping of materials are done, not more than 5 Door Installation of doors to be carried out strictly adhering to Approved materials with proper MAR and approved shop drawings shall be all available prior to start the work. Opening should be verified as per the approved shop drawing. plastering, tile, marble etc.) be provided as per SDI standard and approved shop drawing. Serving Construction Industry Since 10 years. C. Replace doors that are damaged during installation. C. Fix door frames by anchor bolts located as per approved shop drawings and to be covered by wood caps later. temporary exposed areas since the lattermay attract serious damages to the materials. 5.2. Fix Glass Vision Panels as approved Material and Shop Drawings. WIR should submit to the consultant for the inspection of wooden doors for approval. Prior to setting of frames, bottom of the frames must be coordinated with the level of doorsill, uniform clearance to the finish floor level as per approved shop drawing. All Welded (or) Assembled frames shall be stored as shown in If required, a temporary lifting lug can be welded onto the door frame as long as it will not damage any part of the door or its operating hardware once it is used or removed. lifting cranes, welding machine, drilling machine, scaffolding etc. Safework Method Of Statement. materials should only be wiped with, damp soft cloth [which is to be rinsed well to remove the Sliding folder door leaf shall be seals to meet performance requirements in line with manufacturer's standards as per approved detail elevations, and details. free. During concrete / CMU wall construction, structural opening shall be kept as per construction drawings. and wall shall be verified. are maintained. Joint should be tooled within 5 minutes of application to define as per SDI standard. Adjust the door frames if there is any variation. Projectmanagement123. material so that the materials can be, shifted to the Storage Area without being stationed in (Fire Rated), Fixing solid Beech wood edge by edge with binding machine using edge binding glue, Calibrating the door leaf with sanding machine.